License # CGC1507652 · Licensed & Insured · Cape Coral, FL Call Us Today! 1-239-946-5818
How we build

From pilings to finished dock

Our own crane barges and crews, not homemade machines. Follow our featured tiki hut and dock project from the first piling to the finished result.

Our crane barge sets the new pilings from the waterDuring the build
Pilings go inOur crane barge sets the new pilings from the water
The tiki frame goes up on the new dockDuring the build
Tiki framingThe tiki frame goes up on the new dock
The roof is thatched by hand, layer by layerDuring the build
Hand thatchingThe roof is thatched by hand, layer by layer
The lift canopy and lights are installedDuring the build
Canopy & lightingThe lift canopy and lights are installed
The same dock, finished: vinyl decking, tiki hut and covered liftCompleted
The finished resultThe same dock, finished: vinyl decking, tiki hut and covered lift
Before & after

See the difference

The same project during construction and after we finished.

Before
Tiki hut, canopy lift & dock, before
After
Tiki hut, canopy lift & dock, after
Dock & tiki

Tiki hut, canopy lift & dock

New pilings going in from our crane barge, then the finished dock with vinyl decking, tiki hut and covered lift.

Like what you see?

Let’s design something custom for your waterfront. Free estimates, licensed & insured, 2-year written warranty on new builds.